Crack Battlefield 2 Euro Force Armored Fury
Download File >> https://blltly.com/2sVBkA
McNair approved the 76 mm upgrade to the M4 Sherman and production of the 90 mm gun-armed M36 tank destroyer, but he at first staunchly opposed mass production of the T20 medium tank series and its descendants, the T25 and T26 (which would eventually become the M26 Pershing) during the crucial period of 1943 because they did not meet the two criteria of the Army Ground Forces for accepting new equipment; they were not "battle worthy," and he saw no "battle need" for them. In fall 1943, Lieutenant General Devers, commander of U.S. forces in the European Theater of Operations (ETO), asked for 250 T26 tanks for use in the invasion of France; McNair refused, citing the fact that he believed the M4 was adequate. Devers appealed all the way to the War Department, and Major General Russell L. Maxwell, the Assistant Chief of Staff G-4 of the War Department General Staff, ordered the 250 tanks built in December 1943. McNair finally relented in his opposition, but still opposed mass production; his Army Ground Forces even asked for the tanks to be "down-gunned" from 90 mm to 75 or 76 mm in April 1944, believing the 76 mm gun was capable of performing satisfactorily. Marshall then summarily ordered the tanks to be provided to the ETO as soon as possible. Soon after the Normandy invasion in June 1944, General Dwight D. Eisenhower urgently requested heavy tanks, but McNair's continued opposition to mass production due to persistent serious mechanical problems with the vehicles delayed their procurement. That same month, the War Department reversed course and completely overruled the Army Ground Forces when making their tank production plan for 1945. 7,800 tanks were to be built, of which 2,060 were to be T26s armed with 90 mm guns, 2,728 were to be T26s armed with 105 mm howitzers and 3,000 were to be M4A3 Sherman tanks armed with 105 mm howitzers. As a part of the plan, the British requested 750 90 mm-armed T26s and 200 105 mm-armed T26s.[89] General McNair was killed in a botched air support mission in July 1944, and the path to production for the T26 tank became somewhat clearer. General Marshall intervened again and the tanks were eventually brought into full production. However, only a few T26 tanks (by then designated M26) saw combat beginning in February 1945, too late to have any effect on the battlefield.[90]
In its initial specifications for a replacement for the M3 medium tank, the U.S. Army restricted Sherman's height, width, and weight so that it could be transported via typical bridges, roads, railroads, and landing craft without special accommodation. Army Regulation 850-15 initially restricted the widths of a tank to 103 inches (2.62 m) and its weight to 30 tons (27.2 t) . This greatly aided the strategic, logistical, and tactical flexibility and mobility of all Allied armored forces using the Sherman.[115] 2b1af7f3a8